RCDDv14 Actual Questions – Instant Download 290 Questions [Q154-Q171]


0
Categories : RCDDv14 , BICSI
Rate this post

RCDDv14 Actual Questions – Instant Download 290 Questions

Download Free Latest Exam RCDDv14 Certified Sample Questions

BICSI RCDDv14 Exam Syllabus Topics:

Topic Details
Topic 1
  • Participate in additional bid
  • tender activities (i.e., bidders’ conference, meetings, site walks) as required
Topic 2
  • Produce ICT close-out documentation for the owner to provide the record documentation of the installation
Topic 3
  • Calculate (size) ICT horizontal pathways to ensure standards and code compliance and
  • or client requirements are met
Topic 4
  • Participate in the procurement of ICT materials to ensure the materials match the submittals
  • Define scope of ICT Design
Topic 5
  • Produce ICT Bill of Materials
  • List of Materials (BOM
  • LOM) for the project stakeholders
Topic 6
  • Assess ICT current conditions as required to determine design solutions by conducting a site survey and reviewing record documentation

 

QUESTION 154
Which of the following team members is responsible for ensuring compliance with me contract documents (CDP

 
 
 
 

QUESTION 155
A program is near completion and the benefits will be delivered shortly. The program manager prepares to initiate program closeout activities to release the program resources.
Before initiating closeout and releasing the resources, what should the program manager do?

 
 
 
 

QUESTION 156
Which of the following terms is often used to describe two parallel paths that have identical conductive terminations to two separate grounding reference points?

 
 
 
 
 

QUESTION 157
What is used to facilitate MINOR changes to the Project Requirements?
Request lot Information (RFI)

 
 
 
 

QUESTION 158
Which stakeholder of a project team is responsible to provide closeout documentation to the client? Architect

 
 
 
 

QUESTION 159
Which two of the following documents MUST be submitted by the communication’s project contractor for review and approval? {Select two options.)

 
 
 
 
 

QUESTION 160
An ICT distribution designer is reviewing a client’s site information (spaces and pathways) to determine network technology and equipment selection. This is referred to as a___________design process

 
 
 
 

QUESTION 161
Coupling with electrical circuits can create inductive interference to telecommunications facilities. Which of the following can decrease the coupling effect?

 
 
 
 

QUESTION 162
Status information, including program and component status, cost information, risk analysis and other relevant information, is provided in which of the following?

 
 
 
 

QUESTION 163
A program will generate revenue for several years after it ends. The program manager and the operations manager, who are accountable for managing the benefits after program closure, are in disagreement. The operations manager is concerned that information necessary for managing the processes and benefits after program closure will be unavailable. The program manager expresses that managing the benefits after program closure is not within the scope and must be managed through the scope management plan.
What should the program sponsor do?

 
 
 
 

QUESTION 164
When designing cable tray pathways under an access floor, what is the MINIMUM free space that should exist between the top of the cable tray side rails and the underside of the stringers?

 
 
 
 

QUESTION 165
What step can be a phase of the Bidding and Negotiating process?

 
 
 
 

QUESTION 166
A software company’s program manager is conducting closing procedures for a program. At the last steering committee meeting, realized benefits were presented to the program governance board.
What should the program manager do next?

 
 
 
 

QUESTION 167
A biometrics firm has a facial recognition program with multiple components and project managers The project manager from the mobile device division escalates a vendor-related risk to the program manager After assessing the risk, the program manager determines that this risk may impact other projects within the program. However, this risk has a low degree of Impact and probability of occurring What should the program manager do first?

 
 
 
 

QUESTION 168
A program manager has a multiple-project program that is scheduled to be completed by year’s end. During the program delivery phases of the protects several mandatory changes are identified that would extend the program’s completion date What is the next step for the program manager?

 
 
 
 

QUESTION 169
Company A recently signed a contract with a strategic business partner, Company B, to jointly roll out a new technology Company B is excited about the joint marketing opportunity Company A’s component Quality Assurance team has expressed concerns to you the program manager, Ural the product is being rolled out prematurely and has identified potential issues with backend support systems. QA, however, assures you that a manual work around is possible, but not ideal Company B requests an enhancement to the new product. In a meeting with Company B, you determine that additional funding will be required and resources allocated and scheduled What is your MOST appropriate next step?

 
 
 
 

QUESTION 170
The program sponsor requests a weekly performance report. The tools and techniques to monitor and control program performance include which of the following?

 
 
 
 

QUESTION 171
Before working on equipment, what is the FINAL step in the lockout/tagout (LOTO) procedure?

 
 
 
 
 

Free BICSI RCDDv14 Exam 2022 Practice Materials Collection: https://www.vceprep.com/RCDDv14-latest-vce-prep.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

DMCA Privacy Policy Contact US

© 2022 Latest Exam Prep.