HQT-4180 Actual Questions – Instant Download 37 Questions [Q17-Q33]


0
Categories : HQT-4180 , Hitachi
Rate this post

HQT-4180 Actual Questions – Instant Download 37 Questions

Download Free Latest Exam HQT-4180 Certified Sample Questions

NO.17 Which program is used to perform the “New Installation” procedure on a VSP midrange system?

 
 
 
 

NO.18 You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.
What are two requirements? (Choose two.)

 
 
 
 

NO.19 Which two statements are correct when adding cache to a VSP E590? (Choose two.)

 
 
 
 

NO.20 A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?

 
 
 
 

NO.21 What is the recommended RAID level when creating a Hitachi Dynamic Provisioning (HDP) pool?

 
 
 
 

NO.22 A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.
What are two requirements? (Choose two.)

 
 
 
 

NO.23 What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?

 
 
 
 

NO.24 The SVP of a VSP G900 system failed and you have been asked to replace it.
Which two items must be available to perform the replacement? (Choose two.)

 
 
 
 

NO.25 Which tool do you use to install license keys on a VSP G370 system?

 
 
 
 

NO.26 One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.
What are two requirements to separate the I/Os of the servers? (Choose two.)

 
 
 
 

NO.27 A customer wants to upgrade their VSP E790 with a SAS Expansion feature.
What are three requirements? (Choose three.)

 
 
 
 
 

NO.28 You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?

 
 
 
 

NO.29 Which two VSP systems support attached Drive Box Flash (DBF)? (Choose two.)

 
 
 
 

NO.30 A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?

 
 
 
 

Free Hitachi HQT-4180 Exam 2023 Practice Materials Collection: https://www.vceprep.com/HQT-4180-latest-vce-prep.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

DMCA Privacy Policy Contact US

© 2022 Latest Exam Prep.