This page was exported from Latest Exam Prep [ http://certify.vceprep.com ] Export date:Sat Sep 21 11:56:39 2024 / +0000 GMT ___________________________________________________ Title: HQT-4180 Actual Questions - Instant Download 37 Questions [Q17-Q33] --------------------------------------------------- HQT-4180 Actual Questions - Instant Download 37 Questions Download Free Latest Exam HQT-4180 Certified Sample Questions NO.17 Which program is used to perform the “New Installation” procedure on a VSP midrange system?  MPC  Webconsole  GUM  BECK NO.18 You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.What are two requirements? (Choose two.)  The CHBs must be updated first.  The Microprocessor utilization should be below 50%.  The Cache Write Pending rate should be below 30%.  There should be no sparing processes running in the background. NO.19 Which two statements are correct when adding cache to a VSP E590? (Choose two.)  Cache modules must be installed in CMG1.  Cache Modules must be installed on the CM board.  CMG0 and CMG1 must have the same DIMM type.  This is not supported online. NO.20 A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.What is the valid CFM configuration?  two BM35 per controller  two BM45 per controller  one BM45 per controller  two BM35 per system NO.21 What is the recommended RAID level when creating a Hitachi Dynamic Provisioning (HDP) pool?  RAID 1  RAID 1+0  RAID 5  RAID 6 NO.22 A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.What are two requirements? (Choose two.)  The controller board must support encryption.  The RAID level of RAID Groups in the pool must be RAID 6.  At least 20 GB of Shared Memory must be installed.  The RAID Groups in the pool must be formatted with encryption enabled. NO.23 What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?  1 TB  2.99 TB  65 TB  128 TB NO.24 The SVP of a VSP G900 system failed and you have been asked to replace it.Which two items must be available to perform the replacement? (Choose two.)  the iso file with the correct version of Hitachi Ops Center  the iso file with the correct version of the Windows operating system  the microcode iso file with the correct software versions  the Hitachi Remote Ops Monitor Agent iso file NO.25 Which tool do you use to install license keys on a VSP G370 system?  HSA Embedded  MPC Software  Storage Navigator  Maintenance Utility NO.26 One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.What are two requirements to separate the I/Os of the servers? (Choose two.)  Both servers must be registered in two different Host Groups.  Port security must be enabled on both ports.  The Universal Volume Manager license must be installed.  Two cache partitions must be created on the VSP for the servers. NO.27 A customer wants to upgrade their VSP E790 with a SAS Expansion feature.What are three requirements? (Choose three.)  Two additional Disk Boards (DKBs) have to be installed.  Slots B of both controllers must be available for DKB installation.  The SAS Expansion license has to be installed.  In Shared Memory, the Extension1 has to be enabled.  Drive Boxes (DBs) with SAS interface have to be added. NO.28 You need to replace a failing power supply (PS) in a VSP E590.What is the correct procedure?  Check if the status of the PS is blocked, and if yes, then replace it directly.  Use the Maintenance Utility for blocking the PS, then replace it.  Use the Maintenance Utility for blocking the controller, then replace the PS.  Use the MPC for blocking the PS, then replace it. NO.29 Which two VSP systems support attached Drive Box Flash (DBF)? (Choose two.)  VSP E590  VSP F370  VSP F700  VSP G900 NO.30 A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.What needs to be performed next?  The RAID level must be changed in Storage Navigator.  The RAID level must be changed in the SVP Maintenance window.  The RAID 5 Group must be put into DRU mode in Storage Navigator.  The RAID Group must be deleted.  Loading … Free Hitachi HQT-4180 Exam 2023 Practice Materials Collection: https://www.vceprep.com/HQT-4180-latest-vce-prep.html --------------------------------------------------- Images: https://certify.vceprep.com/wp-content/plugins/watu/loading.gif https://certify.vceprep.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2023-07-24 13:24:24 Post date GMT: 2023-07-24 13:24:24 Post modified date: 2023-07-24 13:24:24 Post modified date GMT: 2023-07-24 13:24:24