300-425 exam questions for practice in 2026 Updated 351 Questions

Cisco 300-425 Exam Syllabus Topics:

Section Weight Objectives
Topic 1: Wired and Wireless Infrastructure Design 30% – Logical infrastructure

  • 1. Architecture choice: centralized, distributed, cloud-managed
  • 2. Licensing, VLAN, QoS, security design

– Physical infrastructure

  • 1. AP power, cabling, switch capacity, mounting, grounding
  • 2. Controller placement, port planning, redundancy

– Radio frequency design

  • 1. High-density, bridging/mesh design
  • 2. Channel planning, power management, antenna selection
Topic 2: Mobility Design 25% – Mobility tunneling

  • 1. Optimization for voice/video
  • 2. Data and control path validation

– Location services

  • 1. Integration with analytics
  • 2. Designing for location accuracy

– Roaming and mobility groups

  • 1. Intra-controller, inter-controller, inter-domain roaming
  • 2. Mobility group roles and configuration
Topic 3: Wireless Site Survey 25% – Survey types and execution

  • 1. Tools: Ekahau, AirMagnet, Planner, spectrum analysis
  • 2. Predictive, pre-deployment, post-deployment, Layer 1 surveys

– Requirements collection and constraint evaluation

  • 1. Physical environment and interference analysis
  • 2. Client density, application types, AP selection
Topic 4: WLAN High Availability 20% – AP and service redundancy

  • 1. SSID and service continuity
  • 2. AP failover, RRM, load balancing

– Controller high availability

  • 1. Georedundancy and disaster recovery
  • 2. Stateful switchover, SSO, N+1, LAG

 

QUESTION 135
A customer has a central Cisco WLC that manages APs in FlexConnect mode. The wireless infrastructure supports multiple small branches. One branch deploys new CCX wireless phones that are authenticated by a central Cisco ISE via PEAP/IMSCHAPv2, and trac is switched locally. The customer must reduce the number of full authentication requests and optimize roaming for the new phones. Which action accomplishes the requirement?

 
 
 
 

QUESTION 136
A small customer has a legacy autonomous mode Wi-Fi deployment that provides a low-density and low- capacity service. The customer wants to update and replace this deployment with the latest Wi-Fi technology but has a fixed budget that will pay only to replace the APs. Which architectural controller deployment model suits this requirement?

 
 
 
 

QUESTION 137
A network administrator uses GRE over IPSec to connect two branches together via VPN tunnel. Which one of the following is the reason for using GRE over IPSec?

 
 
 
 

QUESTION 138
A consulting engineer is preparing to survey a brownfield deployment for a 6000-sqft building with four floors that have APs. The entire building is being remodeled and the furniture, office walls, and decoration are being updated. The engineer must perform a survey analysis on the potential RF impact of newer furniture materials. How must the survey be conducted?

 
 
 
 

QUESTION 139
Refer to the exhibit. A company is designing a Cisco wireless solution that has two WLCs named WLC1 and WLC2 and several APs. An AP named AP12 is a critical AP and is provisioned to be installed in hallway 6, which is located just outside the office of the company director and must always connect to WLC1. Which priority level must be incorporated in the design for AP12?

 
 
 
 

QUESTION 140
Which three pieces of equipment are needed to conduct a fully measured wireless survey? (Choose three.)

 
 
 
 
 
 

QUESTION 141
An enterprise is using two wireless controllers to support the wireless network. The data center is located in the head office. Each controller has a corporate WLAN configured with the name CoprNET390595865WLC-1 and Copr-NET6837l638WLC-2. The APs are installed using a round- robin approach to load balance the traffic.
What should be changed on the configuration to optimize roaming?

 
 
 
 

QUESTION 142
A customer deploys a new Cisco high-density wireless network within the open areas of a mall to provide free public wireless on 5 GHz. The existing mall tenants have their own wireless networks that are independently managed. Which design approach minimizes channel utilization for the public network?

 
 
 
 

QUESTION 143

Refer to the exhibit. An enterprise is using wireless as the main network connectivity for clients. To ensure service continuity. a pair of controllers will be installed in a datacentre. An engineer is designing SSO on the pair of controllers. What needs to be included in the design to avoid having the secondary controller go into maintenance mode?

 
 
 
 

QUESTION 144
An engineer must create data-link redundancy for the company’s Cisco Wireless LAN Controller. The engineer has decided to configure LAG-based redundancy instead of port-based redundancy. Which three features of LAG-based redundancy influenced this decision? (Choose three.)

 
 
 
 
 
 

QUESTION 145
Where must the APs be mounted when used in a high-density wireless network to provide 6 dB to 20 dB of attenuation to a cell?

 
 
 
 

QUESTION 146
An engineer is designing a wireless network to support Cisco Hyperlocation. The customer indicated some How is the design adjusted?

 
 
 
 

QUESTION 147
An engineer is designing a new wireless network. The network needs to meet these requirements:

Which design approach should be taken?

 
 
 
 

QUESTION 148
Which strategies must the engineer use for the antenna deployment model in a warehouse?

 
 
 
 

QUESTION 149
An engineer is designing a high-density WLAN that must support 100 concurrent users with 100 Mbps throughput consistently. The design allows for 20 Mops per cell and per channel on the 5 GHz band. How many channels must the design use to provide 1 Mbps per user prior to RF overhead?

 
 
 
 

QUESTION 150
An engineer working for an enterprise deployed multiple Cisco WLCs. A controller that sits in the R&D division is connected through a firewall and is part of the same mobility group. The engineer must ensure that the mobility tunneling is available through the firewall and test it as R&D engineers roam the production ..within their department. How is this requirement met?

 
 
 
 

QUESTION 151
Which statement about the 9800 Series Wireless Controller mobility tunnel on a Cisco Catalyst 9800 controller is true?

 
 
 
 

QUESTION 152
A school deploys a Cisco wireless infrastructure in its classrooms to support a high density of mobile devices.
The network administrator wants to bond channels in groups of two and only allow APs to send 802.11 management frames at 24 MB. What should be included in the design to accomplish this objective?

 
 
 
 

QUESTION 153
A wireless engineer is getting ready to perform a predictive site survey. The new network needs to support data and voice over wireless. Which two Cisco recommendations should be considered for the design? (Choose two.)

 
 
 
 
 

QUESTION 154
An engineer as performing a Layer 1 passive wireless site survey utilizing a channel analyzer software in the 2.4 GHz spectrum. Which chart indicates the ratio of interference present during the duration of the capture?
A)

B)

C)

 
 
 
 

QUESTION 155
In a high-density stadium deployment, which two design considerations are most important?

 
 
 
 

QUESTION 156
An engineer is working for a manufacturing company that has a centralized deployment model. Guests at headquarters need wireless access for presentations, demonstrations, and sharing of information. The engineer must provide external users with secure guest access by connecting to anchor controllers on the DMZ. Auto-Anchor Mobility has been selected in the mobility group to accomplish it. Both anchors are configured as part of the mobility group for HQ. Which design approach ensures that clients connect to the primary controller first and are pushed to the secondary if the primary fails?

 
 
 
 

QUESTION 157
Refer to the exhibit.

An enterprise is using wireless as the main network connectivity for clients. To ensure service continuity, a pair of controllers will be installed in a datacenter An engineer is designing SSO on the pair of controllers What needs to be included m the design to avoid having the secondary controller go into maintenance mode?

 
 
 
 

Authentic 300-425 Dumps With 100% Passing Rate Practice Tests Dumps: https://www.vceprep.com/300-425-latest-vce-prep.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

DMCA Privacy Policy Contact US

© 2022 Latest Exam Prep.