Real MB-335 Exam Questions are the Best Preparation Material [Q74-Q97]


0
Categories : MB-335 , Microsoft
Rate this post

Real MB-335 Exam Questions are the Best Preparation Material

Practice on 2024 LATEST MB-335 Exam Updated 154 Questions

Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification exam is a scenario-based test that assesses the candidate’s skills in configuring functional areas of Dynamics 365 and integrating them with other business applications. MB-335 exam covers topics such as product information management, inventory management, procurement and sourcing, and demand planning. Candidates are also expected to demonstrate their proficiency in order management, warehouse management, transportation management, and production control.

Microsoft MB-335 certification exam measures the candidate’s ability to manage and optimize the supply chain using Dynamics 365’s functionalities. MB-335 exam is divided into several areas of focus, including implementing and configuring manufacturing, implementing and managing inventory and logistics, and implementing and managing transportation management. MB-335 exam also tests the candidate’s skill in implementing and managing quality control, overseeing cost management, and monitoring and analyzing supply chain performance.

 

Q74. You need to configure the system to meet the requirements.
What should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Q75. Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. IngredientA is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient You need to ensure that the system is set up to support the manufacturing process.
Solution: Set up the IngredientB formula line as a phantom BOM.
Does the solution meet the goal?

 
 

Q76. A discrete manufacturer uses the time and attendance registration for production operations.
All employees register daily clock in and clock out times during a 40-hour. Monday through Friday workweek.
Pay periods are every two weeks. Workers are paid hourly.
The production manager will create work schedules with the following windows:
* Mandatory work hours
* Work hours during which employees can leave early without accruing absences
* Work hours during which employees can work extra time
If a junior production worker works over 90 hours in a pay period. the worker will receive lime and a half over
80 hours. If a senior production worker works over 90 hours in a pay period, the worker will receive double time over 80 hours.
Vou need to configure the system for these requirements.
Where should you configure this functionality? To answer, drag the appropriate forms to the correct requirements. Each form may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Q77. You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Q78. You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company.
It is the end of the year and the labor rates have been recalculated based on new salary data.
You need to update the effective labor costs for all labor groups.
Which element must be updated?

 
 
 
 
 

Q79. You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Q80. A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source.
Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed.
Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Q81. You need to resolve the issue for UserF.
What should you configure? To answer, select the appropriate options in the answer area.

Q82. A company plans to account for indirect costs related to materials used to manufacture products.
The items used to manufacture products have surcharge rates that depend on the type of product being used.
You need to set up the costing sheet to include surcharges for specific items.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q83. A manufacturing company uses discreet manufacturing to make skateboards. Production order picking lists are manually posted after finished good are reported as finished.
A production order has six picking lists posted. The quantities on the picking lists do not match any of the reported or finished quantities. This causes an inventory error for the raw materials. All taw material transactions must be tracked on production order and reconciled.
You need to process a single picking list for each production order.
What should you do first?

 
 
 
 

Q84. A co uses the asset management module in Supply Cham Management. The company has four conveyer systems in the warehouse. A robotic crane moves pallets of products to its conveyer int. Each robotic crane and conveyer line is considered a multilevel asset.
A work order arrives for a conveyer system. A technician completing the work observes that the robotic crane needs a repair. The technician is not qualified to work on the robotic crane.
You need to ensure that the robotic is repaired.
Which two options should you configure? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

 
 
 
 
 

Q85. You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q86. You need to configure lot number control for inventory. Which option should you use?

 
 
 
 

Q87. A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels. Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Q88. You use the master planning module for Dynamics 365 Supply Chain Management.
Planned production orders have been created.
Several sales orders are canceled in response to concerns about recent online reviews of a product.
You need to enable the appropriate action message.
Which action message should you enable?

 
 
 
 
 

Q89. You need to implement the scheduled Kanban requirements.
Which rules should you use? To answer, drag the appropriate rules to the correct requirements. Each rule may be used once, more than once, or not at all. You may need to drag the spirt bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Q90. A manufacturing company is implementing Dynamics 365 Supply Cham Management.
Bill of materials (BOMs) must be calculated using standard cost principles.
Miscellaneous charges must be included in the unit cost price. The explosion mode must arways be enforced as single level.
You need to configure the system to meet the requirements.
Which configuration should you enable for each requirement? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Q91. An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture’ receives and inspects the car, the replacement car can be released to the company.
You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection is worth one point.

Q92. You are a manufacturer using Druitt 365 Supply Cham Management
A new series of orders is authorized for production.
You need to identify which documents to use for the released production order.
Which document should you use tor each requirement? to answer drag the appropriate documents to the correct requirements. Each document nay be used once more than once. or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Q93. A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels.
Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Q94. You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Q95. A manufacturer is implementing Dynamics 365 Supply Chain Management with warehouse management processes (WMS).
Warehouse workers use hand-held devices to pick and stage batch-tracked products for production. The warehouse manager requires that products are removed from on-hand inventory and consumed when they are picked and staged for production.
You need to remove the products from on-hand inventory.
What should you configure?

 
 
 
 

Q96. You need to create the constraint for the ML seat selection.
Which expression constraint should you use?

 
 
 
 

Q97. A company produces generic and name-brand paper plates in the same factory using standard costing and unrig the same Bill of materials and routes to produce both product.
The finance and production teams want a way to new individual raw material consumption costs in the ledger.
You need to add a production group to tie finished good to control postings to the ledger. What should you do?

 
 
 
 

Authentic MB-335 Exam Dumps PDF – Nov-2024 Updated: https://www.vceprep.com/MB-335-latest-vce-prep.html

         

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below
 

DMCA Privacy Policy Contact US

© 2022 Latest Exam Prep.