This page was exported from Latest Exam Prep [ http://certify.vceprep.com ] Export date:Sat Dec 14 8:36:28 2024 / +0000 GMT ___________________________________________________ Title: [Full-Version] 2024 Updated ATLASSIAN Study Guide ACP-610 Dumps Questions [Q26-Q43] --------------------------------------------------- [Full-Version] 2024 Updated ATLASSIAN Study Guide ACP-610 Dumps Questions Newest ACP-610 Exam Dumps Achieve Success in Actual ACP-610 Exam NEW QUESTION 26Analyze the Epic Report shown.Identify why the epic completion date is hard to predict.  Most stories aren’t estimated until the end of the epic  The configured Working Days for the board are unrealistic.  The team is using issue count for their estimation statistic.  The team adds new stories throughout the epic. ExplanationThe epic completion date is hard to predict because the team adds new stories throughout the epic. This means that the scope of the epic is not fixed and can change over time. The Epic Report shows the progress of an epic by comparing the estimated amount of work to the completed work. The report also shows a projected completion date based on the team’saverage velocity. However, if the team keeps adding new stories to the epic, the estimated amount of work will increase and the projected completion date will be pushed further.This makes it difficult to plan and deliver the epic within a certain timeframe. References: Managing Jira Projects Data Center and Server: Certification Bundle, Epic ReportNEW QUESTION 27View the extract of a Jira Software Scrum project’s permission scheme shown.The project uses a simplified workflow.Who can drag and drop issues to the Closed column on the board?  only the board administrator  any user with Jira Software application access  nobody  any logged in user  only members of the Administrators project role NEW QUESTION 28Your company recently created an internal IT project to track hardware requests. View the project configuration below: Project: Hardware request Project lead: Allen Frank Default Assignee: Project leadTo test thetriaging process you create the first issue in the project and select the Macbook 13″ component. You don t update the assignee field and leave it to the default value of Automatic.Based on the current configuration, which value will the assignee field show after creating the test issue?  Allen Frank  Mac Taylor  Automatic  Louise Lin  Unaligned ExplanationBased on the current configuration, the assignee field will show Mac Taylor after creating the test issue. This is because the Macbook 13″ component has Mac Taylor as the component lead and the component/s field has been configured to override the project’s default assignee when using a certain component. Therefore, when creating an issue with the Macbook 13″ component, the assignee field will automatically be set to Mac Taylor, regardless of the default assignee of the project or the value of the assignee field before creating the issue34 References:3: What are components? | Jira Software Cloud | Atlassian Support4: How to enable and edit component/s , affects Version/s and fix version …NEW QUESTION 29You want a built-in report that meets these requirements:– shows the results of a saved filter– groups the results by priority and shows a progress bar for each priority– displays issue status and resolutionWhich report should you use?  Resolution Time Report  Recently Created Issues Report  Time Tracking Report  Single Level Group By Report  User Workload Report  Created vs. Resolved Issues Report NEW QUESTION 30Below you are shown an extract of a field configuration used by all issue types in your project.The field ‘A detailed description’ is a custom field of type Text field (multi-line).Which two statements are true? (Choose two.)  Users will be able to format text in the field.  The field can only be used in combination with the Description system field.  The field is mandatory in each issue type used in the project.  The project is configured to use only a single screen.  The maximum text length is limited to 100 characters. NEW QUESTION 31You are Tasked with restoring archived sub-tasks in a project.The project to which the sub-tasks belong has since been archived, as well.Which is the toned course of action?  restore the parent issues only  restore the project only  restore the parent issues, then the sub-tasks  restore the project, then the sub-tasks  restore the project, then the parent issues ExplanationThe best course of action is to restore the project, then the sub-tasks. This is because sub-tasks cannot exist without their parent issues, and parent issues cannot exist without their project. Therefore, restoring the project first will ensure that the parent issues are also restored, and then restoring the sub-tasks will re-attach them to their parent issues. Restoring the parent issues only will not restore the sub-tasks, as they are still archived.Restoring the project only will not restore the sub-tasks, as they need to be restored separately. Restoring the parent issues, then the sub-tasks will not work, as the parent issues cannot be restored without their project.Restoring the project, then the parent issues is unnecessary, as the parent issues are already restored with the project. References: [Restoring an archived issue], [Managing Jira Projects Data Center and Server:Certification Bundle]NEW QUESTION 32Nadav wants to know how accurate estimates were on issues associated with version 2.2.Which report should he use?  Time Since Issues Report  Resolution Time Report  User Workload Report  Version Workload Report  Time Tracking Report  Single Level Group By Report NEW QUESTION 33Analyze the component configuration of a project as shown.Dave creates an issue and wants to use the auto-assignment feature of Jira. Which statement is definitely correct?  If UX is selected, the issue will be assigned to admin.  If Login and Signoff are selected, the issue will be assigned to Project admin.  If Signoff is selected, the issue will be assigned to Project admin.  If Test is selected, the issue will be assigned to Project lead. ExplanationThecomponent configuration of the project shows that each component has a different default assignee. The default assignee is the user who will be automatically assigned to an issue when that component is selected.The image shows that the default assignee for the Signoff component is Project admin. Therefore, if Dave creates an issue and selects Signoff as the component, the issue will be assigned to Project admin.The other options are not correct because:If UX is selected, the issue will not be assigned to admin, but to Unassigned. The image shows that the default assignee for the UX component is Unassigned, which means that no user will be automatically assigned to an issue with that component.If Login and Signoff are selected, the issue will not be assigned to Project admin, but to Project lead.The image shows that the default assignee for multiple components is Project lead, which means that if more than one component is selected, the issue will be assigned to Project lead.If Test is selected, the issue will not be assigned to Project lead, but to Unassigned. The image shows that the default assignee for the Test component is Unassigned, which means that no user will be automatically assigned to an issue with that component.NEW QUESTION 34Your team often accepts new requests from outside groups during an active sprint. You want to see if such frequent scope change mid-sprint is causing bottlenecks. Which report provides the needed insight?  Control Chart  Burndown Chart  Average Age Chart  Velocity Chart  Cumulative Flow Diagram ExplanationThe Cumulative Flow Diagram is the report that provides the needed insight to see if frequent scope change mid-sprint is causing bottlenecks. The Cumulative Flow Diagram shows the quantity and distribution of work items along different stages of a process over time. The report can help identify potential bottlenecks in the workflow by showing where work items accumulate or stagnate over time. For example, if the report shows a sudden increase or a wide band of work items in the “In Progress” stage, it may indicate that the team is overloaded with work or facing some blockers. If the team often accepts new requests from outside groups during an active sprint, the report can show how this affects the flow of work and the completion of the sprint goal. References: Managing Jira Projects Data Center and Server: Certification Bundle, Cumulative Flow DiagramHeat mapNEW QUESTION 35Jill is the project administrator of the SOFTWARE project.She has the following requirements:– A Testing status should be added to the workflow used by all issue types in her project.– Only developers should be able to transition issues into the Testing status.She consults the Workflows section of her project settings page and finds out that the workflow scheme is used in 2 projects, the SOFTWARE and the HARDWARE project. Luckily, she is also a project administrator of the HARDWARE project.Which of the following statements is true?  She can implement the desired workflow changes if she has the Extended project administration permission in both projects.  She can implement the desired workflow changes since she is the project administrator in both projects.  She will only be able to add the new status to the workflow but won’t be able to implement the desired restriction.  She will not be able to perform any of the changes and has to contact a Jira administrator. NEW QUESTION 36Some issues in your project have labels and others do not.Some tasks in your project are identified by a distinct label: daily_business. You need to prevent these issues from being displayed on the team’s Scrum board Which solution meets this requirement?  * Create a quick filter* Add: NOT labels=”daily_business_  * Update the board sub-filter* Add; AND NOT labels = daily business  * Update the board filter* Add: AND labels NOT IN (daily.business, EMPTY:  * Update the board filter* Add: AND (labels != daily, business OR labels IS EMF ExplanationThe solution that meets this requirement is to update the board filter and add: AND (labels != daily.business OR labels IS EMPTY). This will exclude issues that have the label daily_business from the board filter, which determines which issues are displayed on the board. It will also include issues that have no labels at all, as some issues in your project may not have labels. The other solutions do not meet this requirement, as they either do not exclude issues with daily_business label, or exclude issues with no labels. References: Configuring filters, Advanced searching – operators referenceNEW QUESTION 37Your Scrum board has the following filter query:project in (ENG. DEV) and type in (Bug. Task) ORDER BY Priority ASCYou have the necessary permissions but you are unable to drag an issue into a future sprint in the backlog.  Identify the reason.  The filter should be in DESC order.  Stories are missing from the query.  Ranking is disabled.  The query should only have one project.  The active sprint has not yet been completed. ExplanationThe reason why you are unable to drag an issue into a future sprint in the backlog is that ranking is disabled.Ranking is a feature that allows you to order issues based on their relative priority or importance. Ranking is enabled by adding “ORDER BY Rank ASC” or “ORDER BY Rank DESC” to your board filter query.Ranking is required for Scrum boards, as it determines the order of issues in your backlog and sprints. If ranking is disabled, you cannot drag and drop issues in your backlog or plan future sprints. References:Ranking an issue, Configuring filtersNEW QUESTION 38Your team is using a Scrum board and has many issues planned for future sprints. You need to configure a secondary board that* excludes those planned issues from the board but not from the reports* hides issues in real time when users select multiple conditionsWhich two board configurations satisfy the requirements? (Choose two.)  swimlanes  board sub-filter  board filter  column constraint  quick filters ExplanationTo exclude the planned issues from the board but not from the reports, you need to use a board sub-filter. A board sub-filter is an additional JQL query that is applied to the board filter to further refine the issues displayed on the board. The sub-filter does not affect the reports, which are based on the board filter only. To hide issues in real time when users select multiple conditions, you need to use quick filters. Quick filters are buttons that allow users to dynamically change the view of the board by applying one or more JQL queries.Users can select or deselect quick filters to show or hide issues that match the criteria. References: Configuring filters, Configuring quick filtersNEW QUESTION 39The team wants to flag issues using a category. Their requirements are:* more than one category value can be selected on an issue* new category values can be added by any user* category values can be selected via a dropdown menu* category values can be re-used across all projectsWhich field meets their requirements?  text field  component  user picket  label  checkboxes ExplanationThe label field meets the team’s requirements for flagging issues using a category. Labels are a type of custom field that allow users to add one or more descriptive tags to issues. Users can add new labels on the fly, and select existing labels from a dropdown menu. Labels can be re-used across all projects, and can be searched and filtered easily. A text field does not allow multiple values or a dropdown menu. A component does not allow multiple values or adding new values by any user. A user picker does not allow multiple values or adding new values byany user. Checkboxes do not allow adding new values by any user. References: [Adding, removing and searching for labels], [Managing Jira Projects Data Center and Server: Certification Bundle]NEW QUESTION 40Savresh can create issues and assign them to anyone in the Testers group. However, they cannot re-assign issues to Savresh. What are two possible reasons for this? (Choose two.)  Savresh needs to be a component lead.  Testers need Edit Issues permission.  Savresh needs to be a project lead.  Testers need Assignable User permission.  Testers need Assign Issues permission.  Savresh needs Assignable User permission. Savresh needs Assignable User permission. This permission determines which users can be assigned to issues in a project1. If Savresh does not have this permission, they will not be able to re-assign issues to themselves, even if they can create and assign issues to others.Testers need Assign Issues permission. This permission determines which users can assign issues to other users or to themselves1. If the Testers group does nothave this permission, they will not be able to re-assign issues to anyone, including Savresh.NEW QUESTION 41Analyze the workflow scheme for the SSP project shown below:Which change would require an update to the workflow scheme?  Task and Story need different screens when they are transitioned to Done.  Task and Story need a different screen when they are being created.  Epic and Bug need different screens when they are transitioned to Done.  Sub-task and Bug need a different set of required fields.  Task and Sub-task need a different set of required fields. NEW QUESTION 42A project uses the Simplified Workflow and a Scrum board.You are the project administrator and the board administrator, but Extended project administration is disabled.Which two actions can you perform? (Choose two.)  add a status via the workflow editor  add a status via the Scrum board  set a workflow resolution via the Scrum board  set a workflow resolution via the workflow editor  add a transition via the workflow editor  add a condition via the Scrum board NEW QUESTION 43Development team A is consistently overestimating the work they can complete per sprint. They want to be able to compare work committed and work completed in sprints over time. Which single report provides this information?  Control Chart  Sprint Report  Cumulative Flow Diagram  Created vs Resolved Issues Report  Velocity Chart ExplanationThe Velocity Chart is the best report to compare work committed and work completed in sprints over time. It shows the average amount of work that a team can complete in a sprint, based on the historical data of previous sprints. It also shows how much work was planned and how much was actually completed in each sprint. By looking at the Velocity Chart, a team can see if they are overestimating or underestimating their capacity, and adjust their planning accordingly. Therefore, option E is correct. References: Velocity Chart, Managing Jira Projects Data Center and Server: Certification Bundle Loading … Updated ATLASSIAN ACP-610 Dumps – Check Free ACP-610 Exam Dumps: https://www.vceprep.com/ACP-610-latest-vce-prep.html --------------------------------------------------- Images: https://certify.vceprep.com/wp-content/plugins/watu/loading.gif https://certify.vceprep.com/wp-content/plugins/watu/loading.gif --------------------------------------------------- --------------------------------------------------- Post date: 2024-07-14 09:41:24 Post date GMT: 2024-07-14 09:41:24 Post modified date: 2024-07-14 09:41:24 Post modified date GMT: 2024-07-14 09:41:24