The North American Board of Certified Energy Practitioners (NABCEP) is a non-profit organization that offers certification for professionals in the renewable energy industry. The organization focuses on promoting high standards and professionalism in the industry. One of the certifications offered by NABCEP is the PV Installation Professional (PVIP) Board Certification.

 

QUESTION 35
Which of the following MUST be referenced for determining a site’s design wind speed?

 
 
 
 

QUESTION 36
The point-of-utility connection of a residential utility-interactive PV system is in the main distribution panel. If the busbars of the main distribution panel are rated at 200A, and if the distribution panel has a 200A main breaker, the rated output current of the inverter cannot exceed.

 
 
 
 

QUESTION 37
On a PV system larger than 100kw, which PV array design will provide the HIGHEST degree of performance monitoring.
Granularity, and ease of troubleshooting performance issues?

 
 
 
 

QUESTION 38
Most electric service providers require interactive PV equipment to comply with which for interconnection to their distribution grid?

 
 
 
 

QUESTION 39
Which of the following is the required MINIMUM width of the working space In front of ac disconnect equipment?

 
 
 
 

QUESTION 40
The following dc portion of a PV schematic (functionally grounded conductor not shown) is submitted to the building official for permit approval. The building official, who also is he AHJ, allow the system to be installed by requiring what NEC-required MINIMUM size equipment grounding conductor at Location A?

 
 
 
 

QUESTION 41
The NEC requires that PV systems installed on dwellings incorporate which of the following components?

 
 
 
 

QUESTION 42
How should stratification be eliminated in a set of large, stationary, stationary flooded lead-acid batteries?

 
 
 
 

QUESTION 43
A ground resistance measurement on a newly installed grounding electrode indicates a resistance of 130. The earth connection may be improved by connecting the existing electrode to a:

 
 
 
 

QUESTION 44
According to the NEC, where on a residential PV system MUST the labeling describing the type of rapid shutdown be located?

 
 
 
 

QUESTION 45
A homeowner is weighing the PV module options for a roof-mounted solar array. Which is a correct option to present to the homeowner?

 
 
 
 

QUESTION 46
Aerial lifts used to hoist equipment and PV modules to roof levels may be fieldmodifiedfor uses other than those intended by the manufacturer with which approval or certification?

 
 
 
 

QUESTION 47
A 1. 100 ft, 2 ranch home with cathedralcallingshas a 14 ft. x 41 ft. 8 in , south-facing , composite shingle roof. An engineer has determined that the home’s 2 in, x 6 in. on-center roof rafters are strong enough to gold a solar electric system. The system will have 62.25 in. x 32.50 in. modules with a 1-in gap between modules and a standard twin-rillmounting system number of modules that can fit on the roof on under these conditions?

 
 
 
 

QUESTION 48
Which insulation color is allowed for a current-carrying roottop dc conductor on a functionally grounded 6kw PV system?

 
 
 
 

QUESTION 49
An 8KWsc roof-mounted array is placed on a school building. The inverter is located within 1 ft, of the array boundary and has an integrated ac-and dc-disconnecting switch. The system is to be connected to a 400A load center, protected by a 400A main breaker. Which of the following MUST be included to meet NEC requirements?

 
 
 
 

QUESTION 50
A residential PV system uses two 120.240Vac utility-interactive inverters with a sealed lead-acid battery energy backup for protected loads. The MOST important protected load consideration when operating in the backup mode is that:

 
 
 
 

QUESTION 51
In the middle of a winter day, the data acquisition system for a ground-mounted PV system with large central inverters sends an email alert that system performance is at 50% based on irradiance and temperature performance calculations. No inverters are completely offline. The closed technician is a 4-hour drive from the site, and there are no cameras on site. Which is the BEST response to this situation?

 
 
 
 

QUESTION 52
A AWG THWN-2 PV output conductors from two PV arrays are run in the same 3 in, conduit to their respective functionally grounded inverters in the building. The three PV source circuits are each protected by a
15A fuse in the combiner box at the array. The conduit, which is strapped directly to the roof,is exposed to design temperatures of 140′ F (60’C) during its 30 ft.
Exposed run. What is the MAXIMUM current carrying capability value of the PV output conductors?

 
 
 
 

QUESTION 53
A ground-mounted PV system operating with an open-critical voltage of 550V is in a public park. Which installation procedure will meet NEC requirements for protecting the public from potential electric shock?

 
 
 
 

PVIP Cert Guide PDF 100% Cover Real Exam Questions: https://www.vceprep.com/PVIP-latest-vce-prep.html

Post date: 2024-03-27 13:03:05
Post date GMT: 2024-03-27 13:03:05
Post modified date: 2024-03-27 13:03:05
Post modified date GMT: 2024-03-27 13:03:05