Exam Dumps HPE0-S60 Practice Free Latest HP Practice Tests [Q15-Q31]




Exam Dumps HPE0-S60 Practice Free Latest HP Practice Tests

HPE0-S60 Exam Questions | Real HPE0-S60 Practice Dumps

NO.15 An HPE Synergy customer needs to prevent a timeout and loss of communication during an external switch firmware upgrade.
Click the parameter that the customer should configure within an uplink set to meet this requirement

NO.16 Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.
Which HPE compute system meets this customer’s requirements?

 
 
 
 

NO.17 You configured a vVoI datastore using HPE Storage integration Pack for VMware vCenter.
Which storage object should you check using SSMC to verify whether vVol datastore is configured property?

 
 
 
 

NO.18 You need to configure a RoCE network to enable lossless networking for HPE J2000 Flash Enclosure support Which interconnects are required to support this connection? (Select two.)

 
 
 
 
 
 

NO.19 An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays Where should you start the troubleshooting process?

 
 
 
 

NO.20 Which statement about HPE Apollo 2000 Gen10 Plus platform is true?

 
 
 
 

NO.21 What is a restriction of using a RoCE network?

 
 
 
 

NO.22 After deploying HPE Superdome Flex 280 you need to check Core Analysis Engine (CAE) Log.
Click the appropriate section in the HPE Superdome Flex 280 management interface that will allow you to complete this task.

NO.23 The proposal consists of.
– 3 HPE Synergy 12000 frames
– 6 HPE Composer 2 modules
– 2 HPE Virtual Connect SE 100 GO F32 Module
– 4 HPE Synergy 50 GO interconnect Link Module
Which statements about this proposed design are true? (Select two.)

 
 
 
 
 

NO.24 Which statement about HPE OneView milestone releases is true?

 
 
 
 

NO.25 Refer to the exhibit.

Which statement about this logical interconnect group is true?

 
 
 
 

NO.26 You are troubleshooting an HPE OneView server profile that presents a critical state. The server profile was configured with a Link Aggregation Group What should you check to fix the issue?

 
 
 
 

NO.27 Your customer wants to add dedicated Fibre Channel connectivity to the HPE Synergy frame running HPE Synergy 480 Gen10 compute modules, each with one CPU socket populated Currently they use two 12 Gb SAS switches and two HPE Virtual Connect SE 100Gb F32 Modules for HPE Synergy installed in third fabric.
What must be done to enable dedicated FC connectivity for this HPE Synergy frame?

 
 
 
 

NO.28 Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames How will this change impact the customer environment?

 
 
 
 

NO.29 Your customer manages an HPE Synergy platform using HPE OneView 5.6. To leverage new functionalities, the customer wants to update HPE OneView to version 61 Which statement about this update process is true?

 
 
 
 

NO.30 Your customer used to manage their HPE 3PAR arrays using HPE OneView Now they have replaced these arrays HPE Primera.
How does managing the new arrays compare to managing their old arrays?

 
 
 
 

NO.31 Your customer plans to setup an HPE Synergy solution based on SY480 Gen10 compute nodes with the following connectivity options – SAS connectivity installed in the first fabric – FC connectivity Installed In the second fabric – Ethernet connectivity installed in the third fabric.
Which statement regarding this setup is true?

 
 
 
 

Verified HPE0-S60 Exam Dumps Q&As - Provide HPE0-S60 with Correct Answers: https://www.vceprep.com/HPE0-S60-latest-vce-prep.html 1

Links:
  1. https://www.vceprep.com/HPE0-S60-latest-vce-prep.h tml
Post date: 2023-12-29 12:20:19
Post date GMT: 2023-12-29 12:20:19

Post modified date: 2023-12-29 12:20:19
Post modified date GMT: 2023-12-29 12:20:19

Export date: Sat Sep 21 11:50:55 2024 / +0000 GMT
This page was exported from Latest Exam Prep [ http://certify.vceprep.com ]