QUESTION 119
Which of the following water types is suitable for drinking?

 
 
 
 

QUESTION 120
In the commercial LEED Rating System, which point range will achieve the Certified level of certification?

 
 
 
 

QUESTION 121
The project team is conducting a feasibility study of a building project. The developer has pre-qualified four potential sites that are all financially viable. Within the context of LEED, which site is the most applicable?

 
 
 
 

QUESTION 122
In the commercial LEED Rating System, which point range will achieve the Certified level of certification?

 
 
 
 

QUESTION 123
According to the Indoor Environmental Quality credit category, which of the following is considered an unoccupied space?

 
 
 
 

QUESTION 124
What is the best way to prevent a building’s indoor pollutant(s)?

 
 
 
 

QUESTION 125
Which of the following Is a strategy for improving Indoor Environmental Quality during construction?

 
 
 
 

QUESTION 126
An owner is looking to update the interior materials of the office while promoting a healthier indoor work environment using LEED strategies. During the materials specification, which of the following strategies can the owner take in order to achieve this goal?

 
 
 
 

QUESTION 127
Which strategy for roof coverage best addresses both heat island effect and rainwater runoff from the roof only?

 
 
 
 

QUESTION 128
Utilizing recycled materials achieves the green building objective of

 
 
 
 

QUESTION 129
An annual survey is given to the building occupants in which they are asked to rate their comfort level with regards to the heating and air-conditioning, acoustics, air quality, lighting levels and cleanliness. Which building staff member is best equipped to evaluate the responses and develop a corrective action plan to address problems and improve occupants’ comfort?

 
 
 
 

QUESTION 130
Light colored paving and cool roofs are terms referring to materials with

 
 
 
 

QUESTION 131
The Interior space of a six-story commercial building is being completely renovated. Which of the following actions should the design team conduct first in order to incorporate green building strategies?

 
 
 
 

QUESTION 132
Which of the following strategies is considered an approach to land management that mimics natural systems and manages rainwater as close to the source as possible?

 
 
 
 

QUESTION 133
Which label or certification indicates reduced water consumption for appliances?

 
 
 
 

QUESTION 134
Which of the following is a source of graywater?

 
 
 
 

QUESTION 135
In which of the following common building applications are chlorofluorocarbons (CFCs) found?

 
 
 
 

QUESTION 136
An owner of newly acquired land wants to design a building that uses materials that have minimal impact on the environment. Which of the following strategies would help achieve this goal?

 
 
 

QUESTION 137
Which strategy can be used during the building process and after occupation to reduce waste?

 
 
 
 

QUESTION 138
Which of the following strategies is considered an approach to land management that mimics natural systems and manages rainwater as close to the source as possible?

 
 
 
 

QUESTION 139
In order to maintain the LEED Green Associate credential, you must earn which of the following continuing education credits?

 
 
 
 

QUESTION 140
A developer has asked the building designer to incorporate a landscape irrigation system using the building’s graywater in order to earn LEED points. Which is the most appropriate source of graywater for this use?

 
 
 
 

QUESTION 141
Limiting the concentration of which of the following substances protects the health of construction personnel?

 
 
 
 

QUESTION 142
A building is located on a site without access to public transportation. Which of the following strategies can a project team implement in order to reduce the environmental impacts associated with how the occupants get to and from the building?

 
 
 
 

LEED-Green-Associate PDF Dumps Are Helpful To produce Your Dreams Correct QA's: https://www.vceprep.com/LEED-Green-Associate-latest-vce-prep.html

Post date: 2023-12-17 13:46:05
Post date GMT: 2023-12-17 13:46:05
Post modified date: 2023-12-17 13:46:05
Post modified date GMT: 2023-12-17 13:46:05