Latest Exam Prep
https://certify.vceprep.com/2022/10/09/q31-q52-2022-reliable-study-materials-testing-engine-for-c_ts422_2021-exam-success/
Export date: Sat Sep 21 14:05:34 2024 / +0000 GMT

[Q31-Q52] 2022 Reliable Study Materials & Testing Engine for C_TS422_2021 Exam Success!




2022 Reliable Study Materials & Testing Engine for C_TS422_2021 Exam Success!

Validate your Skills with Updated C_TS422_2021 Exam Questions & Answers and Test Engine


SAP C_TS422_2021 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).



SAP C_TS422_2021 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.

 

Q31. Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

 
 
 
 

Q32. In the Schedule Production app which setting can you make for the planning strategy?

 
 
 
 
 

Q33. In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

 
 
 
 

Q34. For which categories can you define BOMs in SAP S/4HANA?

 
 
 
 

Q35. You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

 
 
 
 

Q36. For what production type are production orders used?

 
 
 
 

Q37. You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

 
 
 
 

Q38. Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

 
 
 
 

Q39. If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

 
 
 
 

Q40. An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

 
 
 
 

Q41. Which materials have a negative quantity in a bill of materials or in a recipe?

 
 
 
 
 

Q42. What are the possible results of a production planning run in Advanced Planning (PP/DS)?

 
 
 
 
 

Q43. Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

 
 
 
 

Q44. What is the purpose of a reporting point confirmation in repetitive manufacturing?

 
 
 
 

Q45. What does a line hierarchy in repetitive manufacturing represent?

 
 
 
 

Q46. Where do you maintain the work center that represents the production line for repetitive manufacturing?

 
 
 
 

Q47. You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do?

 
 
 
 

Q48. Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

 
 
 
 

Q49. For a production version to be valid and consistent what requirements must be fulfilled?

 
 
 
 
 

Q50. In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

 
 
 
 
 

Q51. Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

 
 
 
 

Q52. You want to use capacity availability checks for production orders. Which settings have to be made for this?

 
 
 
 

Regular Free Updates C_TS422_2021 Dumps Real Exam Questions Test Engine: https://www.vceprep.com/C_TS422_2021-latest-vce-prep.html 1

Links:
  1. https://www.vceprep.com/C_TS422_2021-latest-vce-pr ep.html
Post date: 2022-10-09 12:08:03
Post date GMT: 2022-10-09 12:08:03

Post modified date: 2022-10-09 12:08:03
Post modified date GMT: 2022-10-09 12:08:03

Export date: Sat Sep 21 14:05:34 2024 / +0000 GMT
This page was exported from Latest Exam Prep [ http://certify.vceprep.com ]